projects-computermtg

SELECTED PROJECTS
Illustrations of our experience and know-how

A utility with an aged steam boiler plant was struggling with the availability due to a malfunctioning controls system. Due to the significant age of the plant the management was reluctant to replace the existing system with a new OEM system at a high cost. CPS was asked to provide a customized solution.

  • CPS evaluated the functionality of the existing plant controls system and quickly identified the critical issues.
  • The CPS team was able to overhaul the existing controls system as well as add new functionality and improved human-machine interface design for easier operation for the plant.
  • The implementation of the CPS controls system was made at a significantly lower cost as compared to replacing the existing design with a new OEM application.

Plant controls systems