A utility company planned a new layout for the placement of the air cooled condensers (ACC) in their power plant. The influence that upstream cooling tower exhaust could potentially play on the ACC performance was a concern of the utility. CPS was hired to perform an analysis to evaluate the proposed location with regards to the performance.

  • CPS conducted simulations (CFD) with varying crosswinds to determine the overall affect of the cooling tower exhaust on the ACC units.
  • An in-depth analysis was performed on the wind interaction with surrounding structures and the recirculation zones created throughout the plant.
  • CPS was able to advice the client on an optimized location and improved overall site layout with regards to the performance of the ACC units.

All Engineering Skills Projects

Power plant site model and simulation results