A major building development company with a residential and commercial project was looking for ways to reduce first costs as well as operational costs for its clients. CPS was asked to review the design concept with the target to achieve a more cost efficient HVAC system:

  • CPS provided a detailed energy demand analysis that showed a potential reduction of the cooling system capacity and district cooling fees by up to 30%.
  • As a result of the detailed demand analysis the client was able to cut down MEP investment cost by sizing the equipment accordingly.
  • CPS could also propose measures to reduce energy consumption of the HVAC system that allowed for an 18% reduction of the operational cost.

 

Building and detailed cooling demand evaluation results (BIM)